Originally built in 1988, the administration building on the Children's
Home Society campus no longer met the needs of the growing
organization.
This three phase project - addition, then two areas of renovation
- adds much needed office, therapy and conference space.
The addition, angled toward a pond on the campus, complements the
existing building. A link between the existing building and the
addition is constructed of exposed cedar structure, floor to ceiling
windows, and contains a lobby gallery showcasing the history of CHS.
Two gazebos at the ends of the link further connect the building
with the pod and delineate between existing and new.